West Kelso Subarea Plan FINAL

Printer-friendly versionPDF version

Date Uploaded: 

Friday, May 6, 2016

Document File: 

Development of the West Kelso Subarea Plan included a resident and property owner survey, stakeholder interviews, an Existing Conditions Report, two public workshops, an Alternatives Summary, and this final product which includes a detailed preferred alternative. The West Kelso Subarea Plan provides an introduction to the project, introduces the vision and guiding principles that direct the plan, lays out the plan concept and actions based on the preferred alternative, and provides a matrix for implementing the various actions. Appendices to the plan include background information on public involvement, plan alternatives (including a No Action alternative), and the existing conditions analysis.

Document Department: